Prestigious Coastal Development

Shore Construction has completed a project as main contractor for the prestigious Becton Rough development by Westcoast Lulworth Limited. This £4.8 million luxury residential project is located in the sought-after coastal village of Barton-on-Sea, Hampshire.

4 Nov 2025

AT A GLANCE

Client
Location

Barton-on-Sea

Barton-on-Sea

PROJECT VALUE

£4.8M

£4.8M

Start Date

Oct 2024

Oct 2024

Services
Principal Contractor
Services
Principal Contractor

PROJECT OVERVIEW

This exceptional development comprises six high-specification homes in Barton-on-Sea, carefully designed to complement the area's distinctive character while providing modern luxury living just moments from the sea.

The completed scheme comprises approximately 20,000 sq. ft. of residential accommodation and includes:

  • 2 detached houses (Plots 5 & 6) offering spacious family living with sea views

  • 4 three-storey townhouses (Plots 1–4) combining contemporary design with carefully considered layouts


Each property was thoughtfully designed by UAN Architecture Ltd, with planning permission secured through ARC Architecture Limited. Shore Construction was appointed as Main Contractor, delivering the construction works alongside elements of detailed design, coordination, supervision, services and testing.

Working closely with the client and wider design team, we brought together the architectural, structural and steel packages into a coordinated, buildable solution. Particular attention was given to structure and ceiling heights to protect the proportions and character of each home.

The result is a collection of high-quality homes that combine traditional coastal aesthetics with contemporary design, premium finishes and modern building performance.


PROJECT DELIVERY

The development was successfully delivered on time and on budget over a 75-week programme, commencing on 28th October 2024.

From the initial groundworks through to final handover, Shore Construction managed the delivery of the project with a strong focus on quality, coordination, health and safety and programme control.

The project required close collaboration between multiple disciplines and consultants, with our team coordinating the various design and construction packages to ensure they could be efficiently delivered on site.

Our responsibilities extended beyond construction to include elements of detailed design, services coordination and testing. This was particularly important given the high specification of the homes and the need to carefully integrate building services without compromising the architectural design.

A comprehensive QA and snagging process was undertaken throughout the final stages, ensuring each property met the required standards before completion.


QUALITY, COORDINATION & COMPLETION

Becton Rough presented a number of technical and coordination challenges, requiring close collaboration between the architectural, structural, steel, mechanical and electrical disciplines.

Shore Construction worked closely with the design team to develop and coordinate elements of the M&E design, resolve structural requirements and ensure the various packages could be successfully integrated into the build.

Particular consideration was given to maintaining ceiling heights and the proportions of each home while accommodating the extensive building services required by the specification.

The final stages of the project included detailed testing, inspections and an intensive snagging and quality assurance process. This ensured that each property was completed to the required standards and that the premium specification was delivered consistently across the development.

The project was completed within the agreed 75-week programme and on budget, providing six finished homes to the required standard.


PROJECT TEAM

Working for client Westcoast Lulworth Limited, Shore Construction delivered the development in collaboration with:

  • Architect: UAN Architecture Ltd

  • Planning Architect: ARC Architecture Limited

  • Structural Consultant: Graham Garner & Partners Ltd

  • Employer's Agent: DRP Ltd


The project was delivered by a dedicated Shore Construction team, including Site Manager Steve Seymour, Dan Rattew, Simon Cowell, Gary Skinner and Shai in our Accounts team.


The collaborative approach across the client, design team, consultants, contractors and Shore Construction team was central to the successful delivery of the project.



STRUCTURAL INNOVATION

The development incorporated a combination of traditional and modern construction techniques, carefully selected to suit the individual properties and the coastal location.

Key structural elements included:

  • Advanced foundation solutions accounting for the coastal location

  • Precision-engineered steel frame construction for the townhouses

  • Traditional cut roof construction for the detached houses

  • Concrete plank flooring systems for enhanced structural integrity

  • Detailed coordination of structural, architectural and steel packages

  • Careful coordination of structure and ceiling heights to maintain the proportions of each home

By integrating the architectural, structural and steel packages into a single buildable solution, the team was able to address technical requirements while protecting the design intent of each property.


PREMIUM SPECIFICATION

The development was delivered to a high-end specification, with the quality of materials, finishes and building services requiring careful coordination and attention to detail throughout.

Key elements included:

  • External Materials: Nelissen Rosina clay facing bricks, natural slate and Beauvoise interlocking tiles

  • Windows: High-performance aluminium window frames

  • Heating: Underfloor heating throughout with individual zone controls

  • Renewable Technology: Air Source Heat Pump (ASHP) systems providing sustainable heating and hot water

  • Ventilation: Mechanical Ventilation with Heat Recovery (MVHR) systems

  • Joinery: Bespoke fitted joinery and wardrobes

  • Lighting: Lutron RA2 Select lighting systems with room sensors

  • Kitchens & Sanitaryware: High-end kitchens and premium sanitaryware

The specification called for a premium finish alongside tight coordination of the mechanical and electrical services. Shore Construction developed and coordinated elements of the M&E design, ensuring services were correctly integrated within the architectural and structural constraints of each property.


SUSTAINABLE LIVING

Environmental performance was an important consideration throughout the development, with each home incorporating modern technologies and building fabric designed to provide comfortable and efficient living.

The homes feature:

  • Air Source Heat Pumps: Providing efficient heating and hot water

  • MVHR Systems: Whole-building mechanical ventilation with heat recovery

  • Underfloor Heating: Energy-efficient heating with individual room controls

  • High-Performance Glazing: Aluminium windows providing improved thermal performance

  • Modern Insulation: High-performance insulation systems exceeding current building regulations

The completed homes achieved an air tightness result of 3 m³/h.m², with an energy rating of B within the SAP calculations, demonstrating the focus placed on building performance alongside the premium specification.


SUSTAINABLE LIVING & RESPONSIBLE CONSTRUCTION

This project exemplifies Shore Construction's commitment to delivering exceptional residential developments through careful planning, responsible construction and collaborative project management.

Health and safety remained a priority from commencement through to completion, supported by structured site management, regular inductions, toolbox talks, inspections and safety advisor visits.

Our supply chain partners worked collaboratively and in accordance with the project phase plans, contributing to the safe and efficient delivery of the works.

The project's strong focus on quality assurance, testing and detailed coordination enabled us to successfully manage the demands of a high-specification development while maintaining programme and budget.

The result is a set of homes that perform as well as they look, combining premium finishes and considered design with modern energy-efficient systems and strong building performance.

Becton Rough was delivered on time and on budget, with the finished development providing six distinctive homes designed for comfortable, sustainable living for years to come.


As the client commented:

"We are very grateful to the whole team at Shore Construction for working collaboratively and to high standards."

We are proud to have delivered Becton Rough and to have worked alongside the client and wider project team to bring this exceptional development to completion.

A large construction site with workers and heavy machinery is surrounded by scaffolding and a partially constructed building in an urban area.

GET IN TOUCH

WORK WITH US

Speak with our team to explore your project needs and how we can help deliver it — efficiently, safely, and at scale.

Simon Cowell

Operations Director

A large construction site with workers and heavy machinery is surrounded by scaffolding and a partially constructed building in an urban area.

GET IN TOUCH

WORK WITH US

Speak with our team to explore your project needs and how we can help deliver it — efficiently, safely, and at scale.

Simon Cowell

Operations Director

A large construction site with workers and heavy machinery is surrounded by scaffolding and a partially constructed building in an urban area.