Construction Management UK | Shore Construction
Appointment for £33m Mixed-Use Scheme
Shore Construction appointed on Construction Manager basis for prestigious Phase 2 of Wimbledon Place - 135 contemporary homes in Southwest London's most sought-after location
4 Nov 2025

AT A GLANCE
Client
Location
PROJECT VALUE
Start Date
Shore Construction has been appointmed as Construction Manager for Phase 2 of Wimbledon Place, a landmark £33 million mixed-use development in the heart of Wimbledon, London SW19. This prestigious project perfectly demonstrates our expertise in complex urban regeneration and mixed-use construction.
A Development That Transforms Communities
Wimbledon Place represents everything we believe in at Shore Construction - creating exceptional living spaces that enhance communities while delivering sustainable, future-focused design. Developed by Thornsett in partnership with YMCA St Paul's Group, this ambitious scheme will transform a key site in Wimbledon's town centre.
The development combines 135 design-led private apartments with a new 120-bedroom YMCA facility, community amenities, and 396 sqm of ground floor commercial space. It's a perfect example of how thoughtful mixed-use development can address multiple community needs while creating vibrant, sustainable neighbourhoods.
Working with Industry Leaders
We're delighted to work alongside Thornsett, a family-owned developer with a 39-year track record of delivering award-winning residential projects. Their expertise in every stage of development - from site identification to final disposal - perfectly complements our construction management capabilities.
Our appointed MEP contractor, Valletric Limited, brings specialist expertise in:
Advanced heat pump systems on ambient loops
Individual water source heat pumps
Building Management Systems (BMS)
Fire detection and security installations
Energy monitoring systems
Construction Management Approach
Our Construction Manager appointment reflects the project's complexity and Thornsett's confidence in our ability to deliver exceptional results. This approach allows us to:
Provide expert oversight of all construction activities
Manage complex interfaces between residential and commercial elements
Ensure sustainability targets are met throughout construction
Deliver cost certainty while maintaining quality standards
Coordinate multiple specialist contractors seamlessly
Timeline and Progress
Project Schedule
Phase 1: Complete
Phase 2: Commenced February 2025
Practical Completion: Summer 2026
We mobilised on-site in February 2025, with our experienced project team establishing site operations and beginning the careful demolition of the existing 9-storey YMCA building. Our systematic approach ensures construction proceeds efficiently while minimising disruption to the surrounding busy town centre location.
The Shore Construction Difference
Proven Track Record in Complex Projects
Wimbledon Place builds on our established reputation for delivering challenging urban projects:
Experience with mixed-use developments combining residential and commercial elements
Expertise in sustainable construction and BREEAM certification
Proven ability to work in constrained urban environments
Strong relationships with specialist subcontractors and suppliers
Commitment to Excellence
Every aspect of Wimbledon Place reflects our core values:
Quality without compromise in every construction detail
Innovation in sustainable building methods
Partnership with clients, consultants, and communities
Delivery on time and on budget
Our construction approach ensures the development meets demanding Greater London Authority requirements, including:
BREEAM 'Very Good' certification for the YMCA facility
Circular Economy principles throughout construction
Urban Greening Factor of 0.4 with extensive green roofs
73% dual aspect homes maximising natural light
Wimbledon Place showcases our commitment to sustainable construction through:
Heat pump technology reducing carbon footprint
Photovoltaic panels for renewable energy generation
Passive design principles including natural ventilation
Highly efficient thermal envelope exceeding building regulations
CASE STUDIES





